School Construction Authority
In contract
The construction project at PS 29K involves adding a five-story brick masonry addition with a cellar, primarily for a new elevator and separate toilet facilities. This addition will significantly enhance the building's accessibility and functionality. Additionally, the project includes constructing an accessible ramp at the main entrance and making interior alterations to ensure full program accessibility compliance. Other aspects of the project encompass installing a fire alarm system, a public clock, and a public address system. The new construction will integrate essential low voltage systems, ensuring seamless operation of the elevator and other facilities. Detailed provisions cover cutting, patching, and restoration of existing structures, emphasizing adherence to safety and structural integrity throughout the alterations. This comprehensive approach ensures improved accessibility, modern amenities, and enhanced safety features for the entire facility.