Bareburger 1681 East 87th Street


Project Information

Location
Client

Petrus Tzanidakis

Statuscompleted

The project was finished in 2014

CategoryOther

Other miscellaneous projects

Cost

$300,000

Designer

Theta Design

Description

Allcon was selected as the General Contractor to complete a full renovation/interior fit-out for a Bareburger establishment. In order to complete the work on a tight schedule, Allcon implemented pedestrian protection along a busy NYC street and modified the existing structure by removing an existing stair and installing new wood joists and subfloor. The restaurant was fitted with a decorative tin ceiling and reclaimed wood planks, and fire-rated materials were installed to establish the required fire rating between the first-floor restaurant and residential apartments above. Allcon also provided all the necessary MEP systems, filtration, and fire protection for the fit-out and installed all furniture and equipment through close coordination with the owner. This project was the first of two Bareburger restaurant projects successfully completed by Allcon.


Footer Logo

© 2025 Allcon Contracting Corp. All rights reserved